Friday, 28 February 2014
Saturday, 22 February 2014
WEEK 1 AND WEEK 2
During week 1 and 2, I have gone through what is done for my
final year project 1 last semester. For more understanding I have learn more about GSM System and the circuit that I must use for this project. The aim and objective for this project is to develop the Reading Meter Using GSM System that produce the
electrical energy and data communication to connect between hand-phone and GSM.
I also have made some of the circuit design ideas for my project. From the picture below, there are some ideas and I must do it to make me achieve my objective.
Saturday, 15 February 2014
INTRODUCTION TO FINAL YEARS PROJECT 2
For Final Years Project 1 last semester, I have decide to do the Electrical Energy Meter Monitoring System with Mobile Network Integration and I will develop this project in this semester.
INTRODUCTION:
This blog presents design and development of a GSM based energy monitoring. This system integrates digital energy meters installed at our home with our handphone. Single phase or three phase digital electric meter can be used with indigenously developed add on transmission module, which takes the meter reading and utilizes the GSM network to transmit the energy usage reading using Short Message Service (SMS) back to the energy supplier. At the supplier end, an energy monitoring system is used to manage all received meter readings, compute the billing cost, update the database and maintain an energy consumption profile for each user. Various alerts and control can also be generated by the owner. A simple, cost effective and reliable working prototype of complete system has been developed using digital energy meter to demonstrate an efficient and transparent means of automatic meter reading, billing and notification through the use of GSM network.
Subscribe to:
Posts (Atom)