PROGRESS 7 : WORK PLAN 


The starting point of this project is the literature review and theoretical study. But, these actions are continuous as new information must be gathered from time to time in order to proceed with this project.
After having an overview of the component to include in this project, the suitable components were selected based on the scope and limitation of this project. Hardware implementations begin after the components were available. After that, the whole system was integrated for testing and optimization before the real demo and presentation to the panel of the final year project.



The time frame allocated for this research study is 8 months. It will start in September 2013 and is projected to be completed in May 2014. The Gantt chart for the project and its milestone are shown as in Table 1.
Development of Electrical Energy Meter Monitoring System with Mobile Network Integration configurations for data centre application will be build to enables the community to visualize the impact and application of the proposed methods in determining the best solutions in designing it with respect to reliability and cost. This project will be presented in the FYP Presentation Day.


Table 1