Thursday, 28 November 2013

PRESENTATION WEEK


This is the project presentation week, for FYP sem 1. All FYP sem 1 students will be at Gemilang Hall starting 2 pm until 5 pm. Each student have two assessors to evaluate their project presentation. For my presentation, I was evaluated by two assessors, first Madam Mazhaniza binti Muzamil and another assessor is Madam Nor Khairiah binti Ibrahim. I has present the best I can do without any problems and thanks a lot to our assessors by making our presentation goes smooth and easy.

Wednesday, 20 November 2013

PRESENTATION PREPARATION


In week 10, all FYP sem 1 students will have their project presentation at Gemilang Hall. The purpose of this presentation was to tell the assessor/evaluator about the project ideas and the objective of producing the project. As a preparation for the presentation, I need to make the presentation slides. The slides must contain the introduction of the project, problem statement, objective, project limits, the work plan and also the methodology. I made the slides and discuss with my supervisor/adviser about it. There were some correction and addition needed to be made before the presentation slides ready to be presented in front of the evaluator.

Thursday, 14 November 2013

PROGRESS 8 : BUDGET



Total for all costing is RM700. All the costing and budget above are the estimate only and all the item and components are not finalized at all because there is only estimate and maybe involve with other components and other circuit or any upgrading to the project.

Saturday, 9 November 2013

PROGRESS 7 : WORK PLAN 


The starting point of this project is the literature review and theoretical study. But, these actions are continuous as new information must be gathered from time to time in order to proceed with this project.
After having an overview of the component to include in this project, the suitable components were selected based on the scope and limitation of this project. Hardware implementations begin after the components were available. After that, the whole system was integrated for testing and optimization before the real demo and presentation to the panel of the final year project.



The time frame allocated for this research study is 8 months. It will start in September 2013 and is projected to be completed in May 2014. The Gantt chart for the project and its milestone are shown as in Table 1.
Development of Electrical Energy Meter Monitoring System with Mobile Network Integration configurations for data centre application will be build to enables the community to visualize the impact and application of the proposed methods in determining the best solutions in designing it with respect to reliability and cost. This project will be presented in the FYP Presentation Day.


Table 1